Springfield Park, Durban

  • Installed: Jan 2009
  • Length: 1.2km
  • Pipe Size: 250mm - 400mm
  • Type: Foul Sewer
  • 18mm Cable
  • This line had a history of silting up regularly with the water company having to clean the line frequently.
  • Following the FS install the silt issues have been drastically reduced with the cable having a positive effect on the hydraulic flow of the sewer.

Springfield

 

Pilot Tongaat Estate, Durban

  • March 2010
  • Length: 800m+
  • Pipe size: 150mm - 225mm Pipe
  • Type: Foul Sewer
  • 18mm Cable
  • No issues highlighted to date. This live installation was used as the training assessment to level C for H2o Africa.

Pilot

 

Robert Gordon University, Aberdeen

  • Installed: Dec 2009
  • Length: 400m
  • Pipe Size: Up to 600mm
  • 18mm Cable
  • No issues to date

Robert Gordon

 

Dundalk, Ireland

  • Installed: November 2009
  • Length: 4km+
  • Pipe Size: Up to 600mm
  • No issues to date

Dundalk

Technology

Technology

i3 Group is the world’s leading technology company in fibre cable deployment methodology. i3 Group’s innovative technologies and methodologies allow the cost of building fibre networks to be reduced by up to 70%. Equally important is the reduction in road digging, a high traffic disruptive approach, which our unique system drastically reduces by over 60%. Find out more